Combined Tank Farm

Contaminants
 

Petroleum

Size

250 x 100 ft

Location
 

100-500 m

Problem Severity

Unknown

Current Use

Fully-Utilized

Redevelopment Plan

Yes

DEC Database

No

Past Work on Site

First entered into the YRITWC database in 2006. The site was a berry picking location, was phased out as grass and weeds smothered berries. After fuel storage tanks were moved, the site was used to gather firewood. 

Photos

press to zoom

press to zoom

press to zoom

press to zoom
1/4