top of page

Combined Tank Farm

Contaminants
 

Petroleum

Size

250 x 100 ft

Location
 

100-500 m

Problem Severity

Unknown

Current Use

Fully-Utilized

Redevelopment Plan

Yes

DEC Database

No

Past Work on Site

First entered into the YRITWC database in 2006. The site was a berry picking location, was phased out as grass and weeds smothered berries. After fuel storage tanks were moved, the site was used to gather firewood. 

Photos

bottom of page